Tuesday, 13 September 2016

Proposal & Production Snapshot


Creative Industries 2016
Proposal & Production Snapshot
Team number:
Team name:
Title of market offering: Last updated:

12
Skillz That Killz
Birthday Bash (may or may not change) 14/09/2016

1. OFFERING / ‘STALL’
  • ●  Short description of your team’s offering:
    We are providing a nostalgic experience where the audience will be reliving a childhood birthday party. In addition to this, there will be a wall mural where the audience can hand/finger paint what they like.
  • ●  Short description of the way this offering will be presented at the market:
    In order to offer this experience, we have gathered a range of materials to create the atmosphere. Including balloons, Fairy Bread, lollies, party poppers etc
    2. PRODUCTION ITEMS/QUANTITIES/MATERIALS
  • ●  Type and quantity of items/products being produced (if any):
    • ○  200 approx fairy bread quaters
    • ○  1 large Wall Mural ○
  • ●  Any items to be built/assembled for your market ‘stall’ or environment:
    • ○  Large paper to be attached on wall
    • ○  Balloon arch that will be attached to string
    • ○  Birthday banner
  • ●  Any packaging, branding material, or other collateral to be produced :
○ ○ ○
Plastic wrapping on various props
Possibly discarded small pieces of cardboard
Paint on hands from finger painting, will have baby wipes available

● Materials being used, quantities and sources:
Couples loaves of Bread, 1 tub margarine, hundreds and thousands, 20ish balloons, 4 or 5 paper plates, lollies, 1 cardboard banner, several party poppers, 1 plastic table cloth

3. TOOLS/EQUIPMENT/FACILITIES
  • ●  Tools/equipment/facilities needed for production (Provided by Massey? external provider? you?):
    ­Ladder
    ­large scale paper, used as mural for fingerpainting (must look into where to source)

  • ●  Tools/equipment/furniture/facilities needed for installing/presenting at the market (provided by?):
    ­2 white desks ­3 stools
  • ●  Has any electrical equipment that you are bringing in been taken to Uli in the 3D workshop to be safety tested and signed off?
    ­Not required
  • ●  Any storage requirements for materials or other items other than what will fit on the designated trolleys on Level D (this must be signed off by a staff member):
    ­A large box to place our items ( we have about 2 plastic bags worth)
  • ●  Have you discussed any use of Massey tools, equipment or facilities with a technical staff member and made bookings where necessary?
    ­No, but must look into the guidelines for safely attaching paper & string (for balloons) onto wall
  • ●  Have all of your team members had health & safety inductions for the use of all facilities or equipment they need to use?
    ­not required
    4. PRODUCTION SCHEDULE (key tasks and deadlines etc for production)
    5. BUDGET/COSTS
    ­So far it's at about $40/$50, may be more as more things are needed
    6. COLLABORATION
● Any collaboration with other teams (give team numbers and nature of collaboration): ­ nope
7. ANY OTHER NOTES/COMMENTS:
thanks :)))) 

No comments:

Post a Comment